Measure S: Half-Cent Transportation Sales Tax

Better Roads – Safer Streets Program
In November, Stanislaus County voters may have the opportunity to vote on a half-cent sales tax. Money raised by the proposed half-cent sales tax can only be spent on local transportation improvements. The proposed tax would automatically expire after 20 years – after raising approximately $700 million.

The following are Modesto-area projects proposed in the event of a half-cent sales tax dedicated to transportation improvements:
Road Maintenance

Intersection and Interchange Improvements:
Oakdale Road and Scenic Drive Intersection improvements*
Beckwith Road Freeway ramp widening (on and off ramps)*
Carpenter Road and Kansas Avenue Interchange improvements*
Pelandale Avenue Interchange improvements*
Various locations throughout Modesto Slurry/Cape Seals/Surface Treatment*
Estimated cost: $14,556,000
Overlay and Reconstruction:
9th Street Overlay and reconstruct from Tully Road to Carver Road
Oakdale Road Overlay from Floyd Avenue to Sylvan Avenue
Oakdale Road Overlay from Briggsmore Avenue to Floyd Avenue
Claus Road Overlay from Scenic Drive to Briggsmore Avenue
E. Rumble Road Overlay from east of Coffee Road to west of Keller Street
G Street Overlay from east of 9th Street to west of Burney Street
Carpenter Road Overlay from Maze Boulevard to the end of C and G Streets
Woodland Avenue Overlay from Morse Road to Carpenter Road (city portion only)
Dale Road Overlay from Standiford Avenue to Nightingale Drive
Prescott Road Overlay from Rumble Road to Cheyenne Way
B Street Overlay from east of 9th Street to west of 12th Street
Oakdale Road Overlay from north of Scenic Drive to south of Wylie Drive
Tully Road Overlay from Yale Avenue to Briggsmore Avenue
Tully Road Reconstruct from W. Rumble Road to Standiford Avenue
Lakewood Avenue Overlay from Scenic Drive to Briggsmore Avenue
Paradise Road Overlay from Sutter Avenue to Ellen Avenue
7th Street Overlay from I Street to K Street
Prescott Road Overlay from Cheyenne Way to Snyder Avenue
Dale Road Overlay from Nightingale Drive to Pelandale Avenue
Kansas Avenue Overlay and reconstruct from west of Carpenter Road to Rosemore Avenue
Needham Avenue Overlay and reconstruct from east of College Avenue to west of L Street
H Street Overlay from 5th Street to Sutter Avenue
Rosemore Avenue Overlay from Woodland Avenue to Bluegum Avenue
San Juan Avenue Overlay and reconstruct from north of Yosemite Boulevard to south of Miller Avenue
Penny Lane Overlay from Pirinen Lane 170 feet to the east
Hatch Road Overlay from east of Dallas Street to east of Ustick Road
College Avenue Overlay from Briggsmore Avenue to Bowen Avenue
Kingswood Drive Overlay from north of Sylvan Avenue to west of Forest Glen Drive
Forest Glen Drive Overlay from south of Sylvan Avenue to south of Sylvan Meadows Drive
Semple Street Overlay from north of Jones Street to south of Morris Avenue
Whitmore Avenue Overlay from west of Tucson Avenue to city limit
Plaza Parkway Overlay from Sisk Road to Prescott Road
Rosemore Avenue Overlay from Kansas Avenue to Woodland Avenue (city portion only)
Lincoln Avenue Overlay from Yosemite Boulevard to Dry Creek Drive
Estimated cost: $20,683,000

Concrete Crew


Construction Relief and Pavement Management:
Various locations throughout Modesto Pothole repair – minor
Various locations throughout Modesto Pavement maintenance repairs
Various locations throughout Modesto Roadway improvements
Various other locations throughout Modesto Overlay and/or reconstruction
Various other locations throughout Modesto Intersection improvements
Local Match Funds throughout Modesto For State and Federal programs/grants
Estimated cost: $33,761,000
Total Estimated Cost for Projects in First 10 Years: $69,000,000

Planned Projects for Second 10 Years:
Various locations throughout Modesto Overlay and/or reconstruction*
Estimated cost: $33,534,799
Various locations throughout Modesto Intersection/interchange improvements*
Estimated cost: $14,538,605
Various locations throughout Modesto Congestion relief/pavement maintenance*
Estimated cost: $20,504,918
Total Estimated Cost for Projects in Second 10 Years: $68,578,322

Total Estimated Cost for Projects over the 20 Year Life of the Sales Tax: $137,578,322

* Sales tax funds would not cover the full cost of the project on their own. Budget for project to be supplemented by other sources.

Street Paving


Glossary of Terms:
Slurry seal: a mixture of various materials such as: asphalt oil, rock, water and additives aluminum sulfate, latex, etc.

Cape seal: a rock chip seal followed by a slurry seal which provides a more durable road surface than a slurry seal alone.

Reconstruction: involves the addition of a lane or a significant change in the road.

Overlay: a new layer of asphalt over existing asphalt. It can protect and strengthen the existing pavement, reduce the rate of deterioration and make the ride of the road smoother.

Surface patching/treatment: an interim repair using all-weather asphalt materials.

Public Works Department Home


1010 10th Street, Modesto, CA  95354  bullet  P.O. Box 642, Modesto, CA  95353  bullet (209) 577-5200
Technical questions or website bugs may be addressed to webmaster@modestogov.com
City of Modesto Online Privacy and Use Statement