Reports & Studies

Community Development (CD) Reports


Transportation Reports

Streets & Traffic Division Size Posted Date
2008-2009 Disadvantaged Business Enterprise
(DBE) Program (PDF)
81 KB 10/26/08
Fiscal Year 2008/2009 Annual Road Report (PDF) 240 KB 07/13/09

Utilities Reports

Water Division Size Posted Date
City of Modesto/Modesto Irrigation District Joint Urban Water Management Plan 2005 Update 9/15/08
Consumer Confidence Report
Final Integrated Regional Groundwater Management Plan (IRGMP) 111 MB 04/21/09
Modesto Regional Water Treatment Plant Phase Two Expansion Project Subsequent Environmental Impact Report 9/15/08
Preliminary Design Report - Downstream Improvements (PDF) 7.3 MB 9/15/08
Proposed Water Rate Increase/Initiation of Proposition 218 Process 09/04
Public Health Goal Exceedance Report - 2007 (PDF) 67 KB
Turlock Groundwater Basin Groundwater Management Plan (PDF) 3 MB
Urban Water Management Plan (PDF) 2 MB 11/13/01
Water Quality Control (Wastewater and Stormwater) Size Posted Date
Domestic Wastewater Near Term Capacity Study
- Final (March 2006) (PDF)
2 MB 4/07/06
Modesto WDR Gap Analysis 7-11-07 Final Report (PDF) 11 MB 9/15/08
Permits
Phase II Biological Nutrient Removal (BNR)/Tertiary Project Preliminary Design Report (PDR) 04/21/09
Sanitary Sewer Management Plan (SSMP) 15 MB 04/21/09
Sewer Capacity Charges Documents
Sewer Rate Study
Storm Drainage Master Plan - Draft - March 2008 (PDF) 35 MB
Wastewater Master Plans
Wastewater Master Plan Supplement
Executive Summary
Wastewater Treatment Master Plan Supplement - Final
Water Reclamation Feasibility Study - Volume I (PDF) 4 MB
Water Reclamation Feasibility Study - Volume II (PDF) 8 MB

Download Adobe Reader