State Route 132 West Freeway Expressway Phase 1 Project
Project Status
For more information please visit the State Route 132 Project website.
Traffic Impacts
- The Southbound 99 off ramp at Maze 132 (L Street) is currently under a long term full closure. Southbound motorists will be asked to exit at the following "Central Modesto" exit.
11th Street between H Street and G Street
Project Status
The street will be closed down Monday, November 29, 2021 through Thursday, December 2, 2021.
Traffic Impacts
Construction signs will be in place:
• Paving on 11th Street between H Street and G Street.
Motorists are advised to drive slowly with caution and use alternate routes when possible.
New Jennings Water Quality Control Plant Entrance/Exit Project
Project Status
Work is in progress.
Traffic Impacts
Construction signs will be in place:
- Jennings Road has been re-opened to motorists.
- Entrance/Exit road is now open. Gates will begin normal operation at the beginning of December. Entrance gates will automatically open at 6:00 a.m. and close at 3:45 p.m. Exit gates will operate with road sensors.
- Motorists to be advised of new traffic signal installed and is fully operational.
Motorists are advised to drive slowly with caution and use alternate routes when possible.
PG&E Project
Project Status
Work is in progress. Project is expected to be completed by the end of December 2021.
Traffic Impacts
Construction area signs will be in place.
- Lane shifts and lane closures will be in place mostly on east and west bound Woodland Avenue and Coldwell Avenue from Graphics Drive to Tully Road.
- Some lane closures will be in place on 9th Street north and south bound sides.
Motorists are advised to drive slowly with caution and use alternate routes when possible.
PG&E Project
Project Status
Work is in progress. Project is expected to be completed by the end of December 2021.
Traffic Impacts
Construction area signs will be in place.
- Lane shifts and lane closures will be in place mostly on east and west bound Clevenger Drive from Carver Road to Tully Road.
- Some lane closures will be in place on Carver Road and Tully Road north and south bound sides.
Motorists are advised to drive slowly with caution and use alternate routes when possible.
Crows Landing Road Pavement Rehabilitation
Project Status
Work will begin soon. Project is expected to be completed by March 2022.
Traffic Impacts
Traffic control will be in place:
- Crows Landing Road from Pecos Avenue to Hatch Road
Motorists are advised to drive slowly with caution and use alternate routes when possible.