La Loma Phase 3A
Project Status
Work is in progress.
Traffic Impacts
Traffic control will be in place:
- Roble Avenue between El Vista Avenue and Colfax Avenue
- Encina Avenue from El Vista Avenue to Trask Lane
- Trask Lane from Encina Avenue to Bellamy Street
Motorists are advised to drive slowly with caution and use alternate routes when possible.
Briggsmore Avenue, Orangeburg Avenue, & Empire Avenue Pavement Rehabilitation Project
Project Status
Work is in progress. Project is expected to be completed by the end of October 2023.
Traffic Impacts
Traffic control will be in place:
- Lane closure on Briggsmore Avenue at (Briggsmore Avenue & Oakdale Road) and at (Briggsmore Avenue and Coffee Road)
- Road closure El Vista Avenue and Edgebrook Drive
Motorists are advised to drive slowly with caution and use alternate routes when possible.
Highway Village Strengthen and Replace Water Mains
Project Status
Work is in progress. Project is expected to be completed by October 2023.
Traffic Impacts
Traffic control will be in place on the following streets:
- Budd Street & Conant Avenue
- Brenner Way & Conant Avenue
- Sisk Road & Brenner Way
- Earl Street and Sisk Road
Motorists are advised to drive slowly with caution and use alternate routes when possible
Sonoma Trunk Extension, Lift Station & Sylvan Water Main Upgrade
Project Status
Work is in progress. Expected to be completed by November 2023.
Traffic Impacts
Traffic control in place shifting traffic to one lane each way, with flaggers, arrow boards and signs as needed:
- Oakdale Road between Post Office Drive and Mable Avenue
- Sylvan Avenue between Oakdale Road and Aria Way
- Sylvan Avenue is open one lane each way for two-way traffic from Oakdale Road to Lydia Lane
Motorists are advised to drive slowly with caution and use alternate routes when possible.
River Trunk Realignment Gravity System & Shackelford Pump Station Project
Project Status
Work is in progress.
Traffic Impacts
Construction signs & traffic control is set up and will be adjusted as necessary:
- Intersection of Colorado Avenue and Roselawn Avenue is closed.
Following areas are closed to through traffic – Local Resident Access Only.
- Garden Avenue – between Sutter Avenue & Colorado Avenue
- Colorado Avenue – between Garden Avenue & Avalon Avenue
- Roselawn Avenue – Between Pelton Avenue & Colorado Avenue
- Colorado Avenue - from Garden Avenue to Snead Drive
- Colorado Avenue from Garden Avenue to Faustina Avenue
Motorists are advised to drive slowly with caution and use alternate routes when possible.
Sutter Avenue Strengthen & Replace
Project Status
Work is in progress. Project is expected to be completed by the end of September 2023.
Traffic Impacts
Flaggers and detours will be in place. Impacts will be lane shifts, and partial lane closures
Motorists are advised to drive slowly with caution and use alternate routes when possible.
Sutter Trunk Rehabilitation Phase 2
Project Status
Work is in progress. Project is expected to be completed by May 2024.
Traffic Impacts
Construction signs & traffic control is set up and will be adjusted as necessary:
- on Paradise Road between Martin Luther King Drive and H Street
Motorists are advised to drive slowly with caution and use alternate routes when possible.
Upgrade Traffic Signal
Project Status
Work is in progress. Project is expected to be completed by December 2023.
Traffic Impacts
Traffic control will be setup and adjusted as necessary:
- at the Intersections of 11th Street at Needham Avenue, 1st Street at H Street, and Paradise Road at H Street.
Motorists are advised to drive slowly with caution and use alternate routes when possible.