Engineering Services - Land Development Engineering Water Fees
10-
Engineering Services - Land Development Engineering Water Fees
- Single story, single-family residences on a lot of 4,000 square feet or less.
- Two-story single-family residence on a lot of 4,000 square feet or less, provided the request for such a service is accompanied by a report from a licensed professional engineer that certifies that the 5/8 inch service is adequate to meet the needs of the proposed dwelling.
- a 5/8 inch "service" shall not be allowed for single-family dwellings of greater than 2 stories on lots less than 4,000 square feet.
-
Engineering Services - Land Development Engineering Water Fees
- Water Service Installation
- 1 inch service
- 1.5 inch service
- 2 inch service
- 3 inch service
- 4 inch service
- 6 inch service
- 8 inch service
- 10 inch service or larger
- Water Main Installation - residential, commercial or industrial
- Water Meter
- 1 inch Meter/New Service Pedestrian Lid
- 1 inch Meter / New service - Traffic Lid
- 1 inch Meter / Retrofit Service - Pedestrian Lid
- 1 inch Meter / Retrofit Service - Traffic Lid
- 1.5 inch Meter - Pedestrian Lid
- 1.5 inch Meter - Traffic Lid
- 2 inch Meter - Pedestrian Lid
- 2 inch Meter - Traffic Lid
- 4 inch Meter
- 6 inch Meter
- 8 inch Meter
- 10 inch Meter or larger
NOTE - Service used ONLY for the fire protection so no require a meter. All other new services require a meter.
This fee is charged at the time of the building permit or a separate water permit is issued for the construction of the water line on the property.
- Water Service Installation
-
Engineering Services - Land Development Engineering Water Fees
- Water Main Installation - Residential, Commercial or Industrial
Generally, this fee is charged at the time that the building permit is issued for the property. This fee applies to the old city area (Zone 1) and in the former Del Este area (Zone 2) where the City has significantly strengthened the infrastructure. This fee may be waived in the property owner has already participated in the cost of the water main service the property.
-
Engineering Services - Land Development Engineering Water Fees
- Water Connection for Main Extension
Generally, this fee is charged at the time the water permit is issued for the connection to an existing water main.
-
Engineering Services - Land Development Engineering Water Fees
- Fire Main Test
This fee is charged when a developer requests installation of a hydrant or hydrants. This fee is not charged for hydrants necessary to meet minimum spacing requirements.
-
Engineering Services - Land Development Engineering Water Fees
- Pavement Replacement - Residential (if needed)
- Pavement Replacement - Commercial (if needed)
- Pavement - Residential (Local Streets)
- Pavement - Commercial (Non Local Streets)
This fee is charged at the time that a building permit or water permit is issued for the construction of the water line on the property. This fee can be waived for dirt alleys or where the water line is located in an unimproved road or shoulder.
-
Engineering Services - Land Development Engineering Water Fees
- Outside City Limits Agreement
-
Engineering Services - Land Development Engineering Water Fees
- Reimbursement Agreement Preparation
Generally, this fee is charged immediately prior to the acceptance of the reimbursement agreement by the City Council. This fee is charged as directed by the Engineer.
-
Engineering Services - Land Development Engineering Water Fees
- Deposit to Install Meter on Fire Hydrant for Construction Water
-
Engineering Services - Land Development Engineering Water Fees
- 4 inch Meter
- 6 inch Meter
- 8 inch Meter
- 10 in Meter or larger